Deploying a High Performance Computing (HPC) system is a high-stakes process. Without expert planning and commissioning, even well-specified systems can underperform or face costly delays. Red Oak Consulting delivers targeted HPC installation and commissioning services to ensure your system is correctly designed, integrated, and ready to perform from day one.

Our process:

  • Design Validation: Verifying that the system architecture aligns with your workloads, applications, and performance goals.
  • BoM & Site Infrastructure Review: Checking Bill of Materials for completeness and compatibility, alongside power, cooling, and space requirements.
  • Power & Cooling Strategy Consultation: Advising on scalable, efficient power and thermal solutions to ensure system reliability and sustainability.
  • Installation Planning: Defining rack layout, equipment placement, and integration into your wider environment.
  • Site Coordination: Liaising with your teams and third-party contractors to align on delivery and installation readiness.
  • System Configuration: Installing and configuring the OS, core services, workload manager, and HPC software stack.
  • Testing & Benchmarking: Running diagnostics and performance validation to confirm system functionality and stability.
  • Documentation & Handover: Providing full configuration records and structured handover to your administrators.

Critical Risks in HPC Installation & Commissioning:

Technical Integration Issues

Compatibility issues between hardware and software, particularly when integrating legacy systems and multiple vendors, can delay commissioning, reduce performance, and lead to costly rework that ties up engineering resources.

Infrastructure Constraints

Power, cooling and space requirements are easy to underestimate. Addressing these in the planning phase, with informed assessments and clear escalation paths, helps avoid last-minute redesigns or costly capacity upgrades after deployment begins.

Coordination and Delivery Challenges

Project delays, scope changes, and misalignment between internal teams and vendors can increase costs and impact delivery timelines. Without clear ownership and communication, risks tend to escalate late in the commissioning process.

Security and Compliance Risks

Commissioning is one of the most common points where security missteps occur, particularly when configuration tasks are spread across teams. A consistent, accountable approach to implementation ensures controls are embedded from the outset, not retrofitted under pressure.

Operational Readiness Gaps

Insufficient documentation, training, and support handover leave teams unable to operate systems confidently. This raises the risk of errors, delays in troubleshooting, and extended reliance on costly external resources.

Red Oak made the whole project go smoothly and they understood our expectation. The Team was very friendly and approachable and showed a high level of professionalism. The Red Oak Team put a lot of effort in the commissioning and it was hugely appreciated.”

Swansea University,
College of Engineering
 

The procurement was highly successful. Owen was highly professional and highly knowledgeable. And Mark really saved the day for us. Both Owen and Mark smoothly integrated into the KAUST team but more importantly, believed in our mission to deliver this computer in order to support the global ambitions of KAUST and the kingdom of Saudi Arabia.”

King Abdullah University of Science and Technology

Leaf motif
Leaf motif
Leaf motif

Trusted by Many, Respected by All

Our team boasts a proven track record, having successfully led and project managed over 45 HPC projects of varying sizes and complexities. This extensive experience translates into a streamlined implementation strategy that ensures your new HPC environment is delivered on time, within budget, and exceeding expectations.

Here’s what sets Red Oak Consulting’s approach apart:

Explore Our Range of HPC Consultancy Services

Hand holding a chess piece

Strategy & Planning

Develop an HPC strategy that meets the current and future needs of all users and includes securing funding for a sustainable solution.

Hands using a calculator and pen

Procurement

Managing the complex process of HPC technical specifications, as in-depth as required, to deliver the right solution, on time and in budget.

Hands using a tablet

Implementation

Reduce downtime, mitigate risk, improve performance and ensure reliability to enhance business productivity.

Hands typing on a keyboard

Optimisation

Understand your workflows, the ratio of computational intensity vs data intensity, test performance, speed, agility, whilst analysing all HPC costs to understand its true value.

People with laptop working on server

Managed Services

Boost productivity with our HPC Cloud Computing services, including expert support, system management and research engineering.

With unparalleled experience in deploying major, multi-million-pound systems worldwide, Red Oak Consulting stands as a leader in the field.

0 +

High-Performance Computing projects delivered

0 %

HPC projects delivered on time

0 +

HPC procurements ranging from £100K to £500 million

0 %

Proven track record of customer satisfaction

0 +

HPC in the Cloud projects

FAQs

The procurement process should be thorough enough to clearly outline any consequences of delays for bidders. This mitigates any impact on the customer. Red Oak’s extensive experience with HPC procurements and installations can ensure that any such eventualities are covered.

To minimise delay and cost we recommend a factory acceptance test (FAT). If this is successful, a  site integration and acceptance test (SIAT) should be performed when components are delivered to ensure that no changes have occurred since the factory test. Factory and site acceptance testing will usually be performed by the supplier with oversight from the customer or a third party specialist.
Red Oak has extensive experience in this regard.

Using a trusted, experienced, and independent third party to oversee testing to ensure that the supplier has assembled and tested the order with due diligence and that any commonly overlooked problems are kept in check.

This is highly dependent on the size and scale of the solution. In terms of actual build time this can typically last anywhere between a week to a month. However, depending on the extent of system testing, the full shipping, building and testing process can take up to 6 months or in some cases more.

This is a common scenario and making this a requirement during the procurement process can ensure that the supplier is aware of this need and plans the installation of a smaller test system to help you begin porting your workflows.

Leaf motif
Leaf motif
Leaf motif

Certifications

Latest News

Ready to Bridge the Gap Between Strategy and Success?

Contact Red Oak Consulting today to discuss your HPC implementation requirements. With our expert guidance and proven implementation strategy, your HPC vision will become a reality, propelling your organisation to new heights of success.

Talk to an HPC Expert

Get in touch with our team of HPC experts to find out how we can help you with your HPC, AI & Cloud Computing requirements across:

  • Strategy & Planning
  • Procurement
  • Implementation
  • Expansion & Optimisation
  • Maintenance & Support
  • Research Computing

Call us on
+44 (0)1242 806 188

Experts available:
9:00am – 5:30pm GMT

Name

Download Whitepaper

HPC and Formula One

"*" indicates required fields

Name*

Download Brochure

HPC AI – Deep Dive

"*" indicates required fields

Name*

Take something useful for when the time is right.

Download a short, shareable pack:

Because in a fast-moving market, staying connected matters — and timing is everything.

Download Brochure

HPC Procurement

"*" indicates required fields

Name*